"Almaty - Khorgos" cement concrete road consists of eight sections (see table below). The total length of the road is 305 km. The construction period of each lot is 30 months.
The works under reconstruction of this road is financed jointly by the World Bank Loan No. 8156-KZ dated October 10, 2012, the Loan Agreement under which was ratified in May 23, 2013, as well as by the Budget of the Republic of Kazakhstan.
According to the results of the tender, the following Contractors and Consultants were assigned to the project execution.
Lot No. |
Length |
Name of the Contractors |
Name of the Construction Supervision Consultants |
---|---|---|---|
1 |
km 0-50 |
Dogus Insaat Ve Ticaret A.S. & Gulsan Insaat Sanayi Turism Nakliyat Ve Ticaret A.S. (Turkey) (Lot 1 & 2) |
Donsung Engineering Co. Ltd./ Dong Myeong Engineering Consultants & Architecture Co. Ltd./ «Zhol Sapa» LLP (Korea/Kazakhstan) (Lot 1-3) |
2 |
km 50-111,7 |
||
3 |
km 111,7-171,1 |
JV Todini – Impregilo – KazakhDorStroy (Italy/Kazakhstan) |
|
4 |
km 171,1-214,3 |
Sweroad/Gauff Ingenieure Gmbh/ТОО «Quality Planning Engineers & Consultanting» (Sweden/Kazakhstan) (Lot 4-6) |
|
5 |
km 214,3-259,30 |
||
6 |
km 259,30-304,4 |
||
7 |
Bridges and overpasses at |
JV «Evrascon» – «МО-1» (Azerbaijan/Kazakhstan) (Lot 7) |
Donsung Engineering Co. Ltd./ Dong Myeong Engineering Consultants & Architecture Co. Ltd./ «Zhol Sapa» LLP (Korea/Kazakhstan) (Lot 7 & 8) |
8 |
Bridge Ili (km 283) |
OHL ZS (Czech Republic) (Lot 8) |
At present the Contracts with all Contractors and Supervision Consultants have already been signed and they have started moblisation of personnel and equipment.