Question №63
April 7, 2011
Uraz

Good afternoon! Very interesting and useful website. I would like to know about Kordai pass, as follows. They say that the constructed Transit Corridor will go around this pass, i.e. By-pass will go through Otar settlement. Can it really be that in the near future we will forget our troubles, connected with this “ill-fated” pass? Also, I would like to know, what company is the Contractor for this section of the road?

Answer to question №63
April 7, 2011

Dear Oraz! Design documents for construction “Kordai By-Pass” were prepared in 2009. Its length is 80 km and starts at 162 km of the highway Almaty –Taraz – Shymkent, i.e. where the branch line goes to Otar settlement. The finish is near Kainar settlement at 260 km of the highway.
By-pass will be constructed in two stages. Highway with two lane traffic will be constructed on the first stage. Then it will be widen till four lanes. Coating is cement concrete, except for submountain section, where for the length of 13 km, aiming at the increase of tire grip, the coating will be arranged from crushed stone mastic asphalt concrete.
Maximum longitudinal slope is 4%, which as per “SNiP RK 3.03-09-2006” provides safe speed for car traffic 120 kilometers per hour.
At present bidding procedures have been conducted for determination of Contractor and Engineer. 

 Navigation
 

 

 

«The completion of the Kazakhstan’s section of the Western Europe – Western China International Road Corridor is very important. It is really the construction of the century»

«We set an objective to develop infrastructure. And it turned out to be within our power. We are currently reviving the New Silk Road. We have opened access to the countries of the Persian Gulf and the Greater East. We have opened the Eastern gates, paving the way to the markets of China and the entire Asian continent», "Kazakhstan-2050” Strategy.
 
 
Address of the First President of the Republic of Kazakhstan – Elbasy, 2012.

 

 

 

 

«The executive authorities need a complete, high-quality Nurly Zhol Program. This is a strategic project which will affect the entire transport infrastructure».

 

 

 

 

 

Стратегия 2050

 

 

 

 

"WE-WC" projects
“Nurly zhol” projects
Procurements
Announcements
Press center
Multimedia
Questions & Answers Contacts