For the question you are interested in we propose the detailed information within each of 4 regions through the territory of which Western Europe – Western China Transit Corridor passes.
- Therefore, if the total length of Western Europe – Western China Corridor on the territory of Aktobe Oblast is 628 km, then at present 487 km have been put into operation, traffic for vehicles has been open for 101 km of the road. Traffic for 40 km is in operation along temporary diversion road.
- The length of Western Europe – Western China Corridor on the territory of Kyzylorda Oblast is 812 km. Including 698 km of new constructed road open for traffic. Traffic 86 km is in operation along temporary diversion road. In addition the construction of the road section for Kyzylorda By-Pass is in progress with the length of 28 km along which the traffic has not been open yet.
- The length of Western Europe – Western China Corridor on the territory of South-Kazakhstan Oblast is overall 319 km, including 80 km along the existing road. And for 139 km the traffic is open along the new constructed cement concrete road. The length of temporary diversion road is 49 km. In addition the roads are constructed in diversion of Shymkent city and Temirlan village with total length of 51km, where traffic has been also temporarily closed.
- The length of Western Europe – Western China Corridor on the territory of Zhambyl Oblast is 494 km. all the road has been open for traffic with good pavement in direction to Almaty – Shymkent, including along the new road 312 km, together with a new road section “Kainar – Merke”, which reduces the way for 80 km. Traffic along the old pavement is in the road sections: Otar – Kordai, interchange at Kainar village, traffic through Kulan village, traffic through Taraz city. At present the road sections have not been completed for Zhambyl Oblasr, as follows: diversion of Korda By-Pass – 80 km (2013), Kulan village By-Pass – 20 km (2013), Taraz city By-Pass – 65 km (2015), and approach to Kyrgyzstan Border – 17.7 km (2013).
For some road sections the construction works are still in progress. Due to that it is required to observe the road signs, speed regime and Traffic Rules.