Question №227
May 03, 2013
Erlan Makanov | Almaty city

Good afternoon! How many kilometers of the highway have been constructed within Western Europe – Western China Project? How many constructed road sections in total have been put into operation? What is a total length of road sufficient for traffic? I am asking these questions due to the fact that in August we are going by car from Almaty to Uralsk, therefore to make a motor race. Accordingly we are planning the most sufficient and comfortable route! Thanks in advance!!!

Answer to question №227
May 15, 2013

For the question you are interested in we propose the detailed information within each of 4 regions through the territory of which Western Europe – Western China Transit Corridor passes.

- Therefore, if the total length of Western Europe – Western China Corridor on the territory of Aktobe Oblast is 628 km, then at present 487 km have been put into operation, traffic for vehicles has been open for 101 km of the road. Traffic for 40 km is in operation along temporary diversion road.

- The length of Western Europe – Western China Corridor on the territory of Kyzylorda Oblast is 812 km. Including 698 km of new constructed road open for traffic. Traffic 86 km is in operation along temporary diversion road. In addition the construction of the road section for Kyzylorda By-Pass is in progress with the length of 28 km along which the traffic has not been open yet.

- The length of Western Europe – Western China Corridor on the territory of South-Kazakhstan Oblast is overall 319 km, including 80 km along the existing road. And for 139 km the traffic is open along the new constructed cement concrete road. The length of temporary diversion road is 49 km. In addition the roads are constructed in diversion of Shymkent city and Temirlan village with total length of 51km, where traffic has been also temporarily closed.

- The length of Western Europe – Western China Corridor on the territory of Zhambyl Oblast is 494 km. all the road has been open for traffic with good pavement in direction to Almaty – Shymkent, including along the new road 312 km, together with a new road section “Kainar – Merke”, which reduces the way for 80 km. Traffic along the old pavement is in the road sections: Otar – Kordai, interchange at Kainar village, traffic through Kulan village, traffic through Taraz city. At present the road sections have not been completed for Zhambyl Oblasr, as follows: diversion of Korda By-Pass – 80 km (2013), Kulan village By-Pass – 20 km (2013), Taraz city By-Pass – 65 km (2015), and approach to Kyrgyzstan Border – 17.7 km (2013).

For some road sections the construction works are still in progress. Due to that it is required to observe the road signs, speed regime and Traffic Rules.

 Navigation
 

 

 

«The completion of the Kazakhstan’s section of the Western Europe – Western China International Road Corridor is very important. It is really the construction of the century»

«We set an objective to develop infrastructure. And it turned out to be within our power. We are currently reviving the New Silk Road. We have opened access to the countries of the Persian Gulf and the Greater East. We have opened the Eastern gates, paving the way to the markets of China and the entire Asian continent», "Kazakhstan-2050” Strategy.
 
 
Address of the First President of the Republic of Kazakhstan – Elbasy, 2012.

 

 

 

 

«The executive authorities need a complete, high-quality Nurly Zhol Program. This is a strategic project which will affect the entire transport infrastructure».

 

 

 

 

 

Стратегия 2050

 

 

 

 

"WE-WC" projects
“Nurly zhol” projects
Procurements
Announcements
Press center
Multimedia
Questions & Answers Contacts