Question №345
January 18, 2015
Tumenbai Tumenbai | Almaty region Ili district Bayserke village

I am a head of the farm located in Bayserke District. WE-WC Road passes through the territory of our farm, and three hectares of land were seized from us. As a result, farm land was divided into two sections. As a result, we will have the problem of watering the northern part of the plot. Where can I clarify whether there will be provided facilities for the passage of water from the top to the bottom of the plot. It is also necessary for the road operation. In case if there will not be such structures there will be accumulation of water along the road. This is in the eastern part of Bayserke village immediately after crossing the railroad.

Answer to question №345
February 6, 2015

Dear Tumenbai, having considered your request regarding irrigation of north side of section and water collection along constructing road, we inform the following.
- For irrigation of north part of agricultural area, the construction of pipe culvert at irrigation channel at PK 59+15 is considered
- In order to avoid the water collection along the constructing road, the construction of side water drainage ditches will be performed with their further diversion to PK 65+91.

 Navigation
 

 

 

«The completion of the Kazakhstan’s section of the Western Europe – Western China International Road Corridor is very important. It is really the construction of the century»

«We set an objective to develop infrastructure. And it turned out to be within our power. We are currently reviving the New Silk Road. We have opened access to the countries of the Persian Gulf and the Greater East. We have opened the Eastern gates, paving the way to the markets of China and the entire Asian continent», "Kazakhstan-2050” Strategy.
 
 
Address of the First President of the Republic of Kazakhstan – Elbasy, 2012.

 

 

 

 

«The executive authorities need a complete, high-quality Nurly Zhol Program. This is a strategic project which will affect the entire transport infrastructure».

 

 

 

 

 

Стратегия 2050

 

 

 

 

"WE-WC" projects
“Nurly zhol” projects
Procurements
Announcements
Press center
Multimedia
Questions & Answers Contacts